Water Resources Education and Research at a Model HBCU Water Resources Center
Central State University has the nations only fullfledged degree program in water resources management at the undergraduate level. The program was founded on the assumption that water...

Wind Lake Improvement Plan Dredging Project Wind Lake, Wisconsin
Dredging has been used historically to improve navigation, however, it usefulness as a water quality improvement tool has not been widely proclaimed. Although costly to undertake, dredging...

Willingness and Ability to Pay for Rural Water
Estimates of willingness to pay for rural water systems were developed in South Dakota, Oklahoma, and Montana from responses to contingent valuation surveys. Ability to pay was also estimated...

Mitigation of Non-Point Source Pollution Impacts on Groundwater Aquifers: A Case Study
This paper presents methodologies applied to a regional-scale project to study the potential impacts of storm runoff on groundwater aquifers that store sole source water supplies in Morris...

The Economic Cost of Stocking Catchable Rainbow Trout
States annually stock about 20 million pounds of catchable trout in public waters. Complete information on cost is essential to help wildlife agencies make operating and planning decisions....

Aquifer Storage and Recovery at the Centennial Water and Sanitation District
water in a suitable aquifer, the peak time capacity of CWSD could be increased while delaying the water treatment plant (WTP) expansion currently scheduled for 1996. To validate this assumption,...

Development of Missouri River Navigation Analysis
The navigation analysis for the Master Manual review examined mainstem reservoir regulation alternatives by evaluating the benefits of reservoir releases for barge transportation. Navigation...

Technical Understanding in Successful Environmental Negotiations
Scientists at the National Ecology Research Center conducted a series of case studies of consultations concerning the environmental conditions to be included in Federal Energy Regulatory...

Water Resources Development in the 1990's: A New Process
The development of water resources to meet future water needs has become more complex nowadays as regulatory agencies attempt to balance the proposed consumptive uses of water with a wide...

Graphical-Based Productivity Transient Investigation Using DISCO
Construction operations involve complex resource interactions and are typically performed in the field with exogenous factors such as inclement weather conditions and equipment breakdowns....

Using Computer Programs to Develop As-Built Schedules
An as-built schedule documents how a project was built over time. It indicates the start and the end dates of each activity during the construction. This schedule is often used to evaluate...

Decision-Making Paradigm for Risk Assessment of Hazardous Wastes Using Fuzzy Sets
This paper summarizes the development of a risk assessment framework to provide risk-cost policy alternatives to prioritize remediation actions for hazardous wastes. The framework is a...

Creation of a Modernized Land Information System for Milwaukee County
This paper provides a case study of the creation of a parcel based land information system for a large metropolitan county. The paper describes the structure of the system and the technical...

Case Storage of Planning Knowledge for Power Plant Construction
Schedulers consider a variety of constraints when they analyze a project to schedule the construction work for it. Often they will start from some schedule that they recall from a previous...

Representation of Case Memory for Structural Design
One of the major issues to be addressed in the application of case-based reasoning to structural design is the representation of design projects in case memory. The content of the information...

Advances and Challenges in Case Based Design
The application of the case-based design (CBD) method to preliminary building design provides an opportunity to overcome problems associated with traditional computer-based design methods....

Case-Based Design in the SEED System
We present the requirements for case-based design in a software environment to support the early phases in building design and outline an approach to satisfy them. We briefly discuss implementation...

Graphic Visualization for Planning Heavy Lifts
The application of graphical visualization to construction can serve a wide variety of objectives and offers many significant benefits. Heavy lifts are an important component of industrial...

Machine learning Applications for Automated Constructability Reviews
Knowledge acquisition of the project design and construction site conditions is essential for determining construction project complexity. An effective knowledge acquisition method is...

Demand/Supply Relationship in Transportation Network Design Problems: A Genetic Algorithm Approach
The cumulative genetic algorithm (CGA) has its significant advantages over the heuristic algorithms in dealing with transportation network design problems. Using CGA, the entire solution...

 

 

 

 